lookup hoppin welch washington
  Home | Mission | Contact | Book Review | Sea to Shining Sea | AMBER Libs | Community | What's New |
About Me
»Bio
»Contact
»John Craft
Internal Links
»Consulting
»Code Tools
»Games
»Mac Goodies
»Blogger
»Blog Mirror
Key Links
»Book Review
»John Welch
»Elizabeth
»A Ray of Sun Shine
»A Ray of Sun Shine
»NCBI
Archives

This page is powered by Blogger. Isn't yours?

Sunday, June 24, 2007

Fixing the 800

The Bruker tech guys came by to upgrade our version of xwinnmr to topspin because of some new feature that would help with our D2O lock... anyway, by the time they got that done something in the new software misconfigured information that probably led to the burnout of a resistor on the Shim-Lock-Control Board. Then the shim stack became suspect. Before we knew it we had to warm up the cryo probe and pull the shimstack out of the bore of the magnet. Anyway, after almost a week of trouble shooting, pulling the new shimstack out and fixing it and replacing the new Bruker control board we finally got the 800 back, and I was able to start up my titration. I learned a lot from John, and the other Bruker guys that did the maintenance on the spectrometer. I really appreciate the expertise of the Bruker engineers. It is sure a beautiful instrument.





From Access To Space



Add your comment (0) comments

Saturday, June 02, 2007

Update to template

Dear viewer,

I have updated the template because Blogger changed the location of my archive files. It should now work.

JWC

Add your comment (0) comments

This page is powered by Blogger. Isn't yours?

"You need to check this one out about taking action in Darfur!" -Crab Turtle
What's New
I am finishing up my rotation!
Capital Web Design